Parameter measurement of the rail geometric position with the testing vehicle KRAB for transit tracks in the railway stations in the district supervised by Správa dopravní cesty České Budějovice – Správa tratí Strakonice
INVESTOR:
ČD s.o. - DDC o.z. - SDC České Budějovice
PERSON IN CHARGE:
Ing. Vladimír Lupoměský
REALIZATION PERIOD:
07/2004 - 09/2004
TOTAL COSTS:
CZK 0,248 million (EUR 8 267)
Parameter measurement of the rail geometric position with the testing vehicle KRAB for transit tracks in the railway stations according to the requirements of SDC in the length of 85 km.