Containerization of Czech Post buildings | |
| INVESTOR: Česká pošta s.p. | |
| DESIGNER: ing. Michal Procházka | |
| REALIZATION PERIOD: 04/2005 |
TOTAL COSTS: CZK 0,15 million (EUR 0,05) |
The construction is a solution to the adaptation of discharge platforms of postal buildings in connection with the gradual transition of Czech Post to the container system of parcel conveyance. The construction included an installation of hydraulic raising platform AGMECO and related construction work – foundation pits for the platforms, extension of roofing, power distribution, adaptation of surrounding hard surfaces and area gates including their drainage. | |