Switch reconstruction in the railway station Žďárec u Skutče (2nd stage)
INVESTOR:
SŽDC s.o., Stavební správa Praha
DESIGNER:
ing. David Derka
REALIZATION PERIOD:
05/2004 - 07/2004
TOTAL COSTS:
CZK 0,5 million (EUR 16 667)
Reconstruction of the Havlíčkobrodský and partly Pardubický railway gridiron including reconstruction of the interlocking plant.