Switch reconstruction in the railway station ďárec u Skutče (2nd stage) | |
| INVESTOR: SDC s.o., Stavební správa Praha | |
| DESIGNER: ing. David Derka | |
| REALIZATION PERIOD: 05/2004 - 07/2004 |
TOTAL COSTS: CZK 0,5 million (EUR 16 667) |
Reconstruction of the Havlíčkobrodský and partly Pardubický railway gridiron including reconstruction of the interlocking plant. | |