Roofing of a boarding school in Letohrad
INVESTOR:
Pardubice region
DESIGNER:
Ing. Pavel Šejna
MAIN CONSTRUCTOR:
Ing. Petr Vašek
REALIZATION PERIOD:
21.7. 2003 – 29.4. 2004
After a roof demolition, superstructure of the 4th and 5th floors was performed. As a result, 16 rooms, 40 beds, 1 social room and 2 kitchens were constructed.