Cycle Trail Svítkov – Popkovice – Staré Čívice | |
INVESTOR: Statutory Town of Pardubice | |
| DESIGNER: Chládek a Tintěra, Pardubice a.s. | |
| MAIN CONSTRUCTOR: Libor Boleslav | |
| REALIZATION PERIOD: 7/2005 - 11/2005 |
TOTAL COSTS: CZK 9,9 million (EUR 0,33) |
New construction of a walking and cycle trail 3 m wide and 1,200 m long, surface drainage in the 125 metre section between the fencing of gardens, construction of street lighting. The constructed trail is a part of a future cycle trail that will connect the city centre of Pardubice with the industrial zone on the outskirts of the city. | |