Reconstruction of platforms at tracks number 2 and 4 in the railway station Náchod | |
| INVESTOR: SŽDC s.o., Stavební správa Praha | |
| DESIGNER: PRODIN spol. s r.o., Pardubice | |
| MAIN CONSTRUCTOR: Ing. Martin Suchomel (Ing. Josef Janča) | |
| REALIZATION PERIOD: 10 – 12 / 2005 |
TOTAL COSTS: CZK 11,5 million (EUR 383 000) |
Reconstruction of platforms and railway superstructure of tracks No. 2, 4 and 6. For the reconstruction of the railway superstructure, regenerated preassembled track sections of the R65 shape on concrete sleepers SB8 with division “c” were used. The whole part of the reconstructed section of the railway superstructure was welded into long welded rails. Between tracks number 2 and 6 a new platform was built, with the “SUDOP” type platform edge 550 mm above the top of the rail, 180 m in length. The platform at track No. 4a was built with the 45-metre platform edge 250 mm above the top of the rail. Both platforms have a barrier-free access through a passageway and adjacent sloping ramps. | |