ČD DDC, Reconstruction of interlocking plant in the railway station Ražice
INVESTOR:
AŽD Praha s.r.o.
DESIGNER:
Ing. Martin Steinberger
MAIN CONSTRUCTOR:
Tomáš Bouchal
REALIZATION PERIOD:
3/2004 – 11/2004
TOTAL COSTS:
CZK 25,2 million (EUR 0,84 million)
Total reconstruction of the railway station Ražice. The investor of the whole project was SŽDC Stavební správa Plzeň (building supervision Plzeň). General investor of the whole project was the company AŽD Praha.

From the foundation was built a new railway base including drainage. Totally 17 switches were treated, out of which two on concrete sleepers and the rest of the shape S49 on the wooden sleepers. Besides that, two railway crossings were repaired – one was of the type STRAIL and the second out of concrete crossing elements.

Dispatcher´s building was structurally treated for a new interlocking plant and unnecessary old interlocks were removed.

Range of work:

SO 301   Ražice, building repairs
SO 302   Ražice, demolition
SO 303   Ražice, railway base – drainage
SO 304   Ražice, railway top
SO 305   Reconstruction of railway crossing in km 253,063
SO 306   Reconstruction of railway crossing in km 253,837