ČD DDC, Reconstruction of interlocking plant in the railway station Ražice | |
| INVESTOR: AŽD Praha s.r.o. | |
| DESIGNER: Ing. Martin Steinberger | |
| MAIN CONSTRUCTOR: Tomáš Bouchal | |
| REALIZATION PERIOD: 3/2004 – 11/2004 |
TOTAL COSTS: CZK 25,2 million (EUR 0,84 million) |
Total reconstruction of the railway station Ražice. The investor of the whole project was SŽDC Stavební správa Plzeň (building supervision Plzeň). General investor of the whole project was the company AŽD Praha.
From the foundation was built a new railway base including drainage. Totally 17 switches were treated, out of which two on concrete sleepers and the rest of the shape S49 on the wooden sleepers. Besides that, two railway crossings were repaired – one was of the type STRAIL and the second out of concrete crossing elements. Dispatcher´s building was structurally treated for a new interlocking plant and unnecessary old interlocks were removed. | |
|
Range of work: SO 301 Ražice, building repairsSO 302 Ražice, demolition SO 303 Ražice, railway base – drainage SO 304 Ražice, railway top SO 305 Reconstruction of railway crossing in km 253,063 SO 306 Reconstruction of railway crossing in km 253,837 | |