Railway siding TPCA
This construction was divided into two constructional objects:
SO 910.1 – railway base
SO 910.2 – railway top
The railway base consisted in stabilization of existing soil with lime stabilizer, embedding of separative geotextiles and setting of base gravel layers. Drainage system including drainage channel TZZ 5 was also built up. The railway top consists of rail S49 on second-hand concrete sleepers and of five embedded rail switches of various shapes. The total length of the railway siding is 2 600m.
Railway siding TSUSHO
This construction was divided into more constructional objects:
SO 28 – railway base
SO 29 – railway top
SO 30 – railway culvert
SO 31 – railway crossings
The siding is partly led in a draft partly on a stabilized railway filling which reached in some parts up to the height of 5 metres. The whole construction of the railway base and railway top is the same as the construction of the railway siding TPCA. It was necessary to build a railway crossing on the place where the railway siding and the service road were crossed. The total length of the railway siding is 1 100m.