Reconstruction of switches in the railway station Žďárec u Skutče
INVESTOR:
SŽDC s.o., Stavební správa Praha
DESIGNER:
Chládek a Tintěra, Pardubice, a.s.
MAIN CONSTRUCTOR:
Ing. Miroslav Šimunský
REALIZATION PERIOD:
8/2004 – 10/2004
TOTAL COSTS:
CZK 24,9 million (EUR 0,83 million)
During reconstruction in the railway station Žďárec was maintained the railway base, were embedded separative geotextiles and built base gravel layers. Drainage of the railway station was also treated – earth plain was adjusted according to specified slope and rainwater drain was provided by new drains.

Within the SO railway top, seven new and three second-hand switches were laid, built a new railway bed and adjusted direction and elevation parameters of the rail. Station rails were also treated.

Antiquated interlocking plant was also reconstructed. This construction work was subdelivered from the company STARMON.

Range of work:

SO 01   Reconstruction of railway top
SO 02   Reconstruction of railway base
PS 01   Reconstruction of interlocking plant