Repair of railway crossing – Horka km 65,999
INVESTOR:
ČD a.s., SDC Pardubice
DESIGNER:
Chládek a Tintěra, Pardubice a.s.
MAIN CONSTRUCTOR:
Luděk Svoboda
REALIZATION PERIOD:
8/2004
TOTAL COSTS:
CZK 3,1 million (EUR 0,103 million)

There was performed a railway crossing on the road of the 3rd class leading from Chrast u Chrudimi to Hlinsko v Čechách. The original level crossing was replaced by a modern crossing construction STRAIL. As a part of the project, drainage system was reconstructed and geometric position of rail as well as a close platform was also partly treated.

Range of work:

Repair of railway superstructure in the place of the railway crossing construction
Setting up a new crossing construction
Drainage repair of the railway crossing
Platform treatment