Repair of railway crossing – Horka km 65,999 | |
| INVESTOR: ČD a.s., SDC Pardubice | |
| DESIGNER: Chládek a Tintěra, Pardubice a.s. | |
| MAIN CONSTRUCTOR: Luděk Svoboda | |
| REALIZATION PERIOD: 8/2004 |
TOTAL COSTS: CZK 3,1 million (EUR 0,103 million) |
There was performed a railway crossing on the road of the 3rd class leading from Chrast u Chrudimi to Hlinsko v Čechách. The original level crossing was replaced by a modern crossing construction STRAIL. As a part of the project, drainage system was reconstructed and geometric position of rail as well as a close platform was also partly treated. | |
|
Range of work: Repair of railway superstructure in the place of the railway crossing constructionSetting up a new crossing construction Drainage repair of the railway crossing Platform treatment | |