Construction of interlocking plant in km 7,015 on the railway track
Dolní Lipka - Štíty
INVESTOR:
ČD a.s., Stavební správa Praha
DESIGNER:
SUDOP Praha a.s.
MAIN CONSTRUCTOR:
Pavel Lukes
REALIZATION PERIOD:
12/2003 – 5/2004
TOTAL COSTS:
Total costs: CZK 8,4 million (EUR 0,28 million)
We worked on the railway crossing construction damaged by heavy vehicles including complete change of the interlocking plant. Construction of railway substructure and crossing drainage and reconstruction of an adjoining culvert were performed.

An original bituminous crossing was replaced by the crossing which was built from STRAIL rubber blocks. For the railway superstructure were used rails of UIC 60 with flexible fastening by tension clamps Skl 14 on concrete sleepers B 91.

At present the improved interlocking plant is in compliance with current safety norms. It was performed as a subdelivery.

Range of work::

SO 01   Railway substructure
SO 02   Railway superstructure
SO 03   Crossing construction
SO 04   Drainage of ground communication
SO 05   Cable connection nn
PS 01   Interlocking plant
PS 02   Communication equipment