Construction of interlocking plant in km 7,015 on the railway track Dolní Lipka - Štíty | |
| INVESTOR: ČD a.s., Stavební správa Praha | |
| DESIGNER: SUDOP Praha a.s. | |
| MAIN CONSTRUCTOR: Pavel Lukes | |
| REALIZATION PERIOD: 12/2003 – 5/2004 |
TOTAL COSTS: Total costs: CZK 8,4 million (EUR 0,28 million) |
We worked on the railway crossing construction damaged by heavy vehicles including complete change of the interlocking plant. Construction of railway substructure and crossing drainage and reconstruction of an adjoining culvert were performed.
An original bituminous crossing was replaced by the crossing which was built from STRAIL rubber blocks. For the railway superstructure were used rails of UIC 60 with flexible fastening by tension clamps Skl 14 on concrete sleepers B 91. At present the improved interlocking plant is in compliance with current safety norms. It was performed as a subdelivery. | |
|
Range of work:: SO 01 Railway substructureSO 02 Railway superstructure SO 03 Crossing construction SO 04 Drainage of ground communication SO 05 Cable connection nn PS 01 Interlocking plant PS 02 Communication equipment | |