Production program proposal for setting up long-welded rails, consultation and approval of the Czech Railways rail and switch welding, rail and frog build up, supply or welding of glued insulated joints or assembly of mounted glued insulated joints management of setting up long-welded rails measurement of weld geometry, radiographic radiation method of welds, clamping temperature measurement elaboration of complete documentation |